Lianhuixin
2012
2011
2010
The annual output of hard board factory exceeds 300,000 ㎡.
2009
The debugging of the newly added automatic line equipment was completed and the test run was successful.
Lianhuixin was successfully granted 8 national patents.
Lianhuixin Trade Union was formally established.
Lianhuixin passed the environmental protection acceptance.
Soft board factory officially put into production and successfully trial-produced soft-hard bonded board.
ERP management system has been fully introduced successfully.
Our Strength
competitive edge
Covered area
test standard
lead-time
With high quality, low cost and foreign information technology support.
The factory covers an area of 8,000 square meters and has 500 employees.
The system passed IS09001,IS014000,IATF16949 certification
Double panel: 12 hours Four-layer board: 24 hours Six-layer board: 48 hours